Skip to the content

Dubai CommerCity expansion targets 91000 sq m by 2028

Dubai CommerCity expansion adds 91,000 sq m at $490m — near-full occupancy signals strong digital commerce demand.

By 2 min read
Dubai CommerCity expansion targets 91000 sq m by 2028
The Dubai CommerCity expansion will add more than 91,000 square metres of new space, backed by a Dh1.8 billion ($490 million) investment, as occupancy across the free zone nears 96 per cent.

Dubai CommerCity is a free zone dedicated to digital commerce and technology businesses. It is a joint venture between the Dubai Integrated Economic Zones Authority and Wasl Group. The second phase spans the Business, Logistics and Social clusters, with delivery running from the first quarter of 2027 through the fourth quarter of 2028.

Capacity follows demand

Dubai Media Office figures show occupancy has reached nearly 96 per cent across CommerCity’s office, logistics and retail spaces. That absorption rate makes the case for additional supply plain. Online trade requires linked office, fulfilment and distribution capacity — all within one ecosystem.

The Business Cluster will offer shell-and-core offices, fitted workspaces and flexible plug-and-play units. These formats serve companies at different stages of growth. They also give regional and international firms more options without leaving the free zone.

Sheikh Ahmed bin Saeed Al Maktoum, chairman of the Dubai Integrated Economic Zones Authority, said the project reflected investor confidence in Dubai’s economic ecosystem. He linked the investment directly to the emirate’s ambition to lead future commerce.

What does the expansion mean for investors?

Phase Two introduces The Hive, a 5,600-square-metre facility inside the Logistics Cluster. It offers 181 flexible units from as small as five square metres. The Hive also includes 24/7 climate-controlled fulfilment areas, digitally managed loading zones and dedicated last-mile delivery facilities.

Its vertical design uses available land efficiently. That model suits digital-commerce businesses that need fulfilment space close to customers but cannot justify large conventional warehouses.

The staged delivery timetable gives investors a clear view of capacity growth. Phase one arrives in Q1 2027; phase two follows in Q4 2028. Meanwhile, demand can develop alongside new supply rather than arriving all at once.

Alignment with Dubai’s D33 agenda

The investment aligns with Dubai’s Economic Agenda D33, which targets a doubling of the emirate’s economy by 2033. The plan also aims to consolidate Dubai’s position among the world’s top three urban economies.

For institutional investors, the key signal here is infrastructure absorption. Near-full occupancy at an existing facility, followed by a committed capital programme, shows real demand — not speculative development.

The expansion also broadens the investable story beyond conventional property. Digital commerce needs offices, fulfilment space, technology systems and efficient logistics infrastructure together. CommerCity’s three-cluster model delivers all of these on one platform.

Investors should track leasing activity, construction progress and occupancy rates across the new facilities as each phase completes. Those metrics will indicate whether demand continues to support Dubai’s digital-economy ambitions through the decade.

Quick answers
How much is the Dubai CommerCity phase two expansion worth?

The second phase carries an investment exceeding Dh1.8 billion, equivalent to approximately $490 million, according to Dubai Media Office figures.

When will the new Dubai CommerCity space be ready?

Delivery is staged across two phases: the first is scheduled for Q1 2027, and the second for Q4 2028.

What is The Hive at Dubai CommerCity?

The Hive is a 5,600-square-metre vertically designed logistics facility within the Logistics Cluster, offering 181 flexible units from five square metres, with climate-controlled fulfilment areas and last-mile delivery infrastructure.

Comments

Leave a comment

Your email address will not be published. Required fields are marked *